@trixiemattel ("Trixie Mattel™") wrote:
Drop the skincare routine sis!
Trixie's Secrets to Out-of-Drag Beauty https://youtu.be/boevh7yNG3Y via @YouTube
@trixiemattel ("Trixie Mattel™") wrote:
Drop the skincare routine sis!
Trixie's Secrets to Out-of-Drag Beauty https://youtu.be/boevh7yNG3Y via @YouTube
@maddow ("Rachel Maddow MSNBC") wrote:
"The bottom line is striking:
Five times a member of Trump's cabinet was referred to the Justice Department for possible prosecution.
Five times nothing happened."
@trixiemattel ("Trixie Mattel™") wrote:
an early shot of my days as a runway model.
@fakedansavage ("Dan Savage") retweeted:
@picardonhealth ("André Picard") wrote:
“People who are brutally honest generally enjoy the brutality more than the honesty” -- Never thought I would see the day when legendary @globeandmail columnist Richard Needham was quoted by sex columnist @fakedansavage https://www.thestranger.com/savage-love/2021/07/13/59067709/savage-love #StrangeBedfellows #journalism
@LilNasX ("nope 👶🏾") retweeted:
@moneyymaya ("Maya Angelique👑") wrote:
The pop star we needed. King of turning controversy into a bag lol
In reply to:
@maddow ("Rachel Maddow MSNBC") wrote:
https://www.rferl.org/a/russia-project-foreign-agent/31362242.html
@LilNasX ("nope 👶🏾") retweeted:
@IWriteAllDay_ ("Clarkisha Kent") wrote:
“Do your mama know you gay???”
I’m sick this man is a comedic genius 😭😭😭😭😭
In reply to:
@laarmen ("Simon Chopin") replied to a tweet by steveklabnik:
@steveklabnik one can point to the "probe" function in both languages to see an example of drastic LoC reduction via language mechanisms and not just syntax/style.
@LilNasX ("nope 👶🏾") retweeted:
@mimiisanalien ("Mia 🖖🏾") wrote:
we waited 9 months for this song n it’s finally here omg
In reply to:
i ain’t fall off i just ain’t release my new shttt 😤😤
@bascule ("Tony “Abolish ICE” Arcieri 🦀") retweeted:
@NWSBayArea ("NWS Bay Area") wrote:
The threat for monsoonal thunderstorms has diminished so we have canceled the Red Flag Warning. #cawx #BayArea
@bascule ("Tony “Abolish ICE” Arcieri 🦀") replied to a tweet by steveklabnik:
@steveklabnik I use SSH because at least last I checked things like netrc don’t support encrypting credentials at rest
@steveklabnik replied to a tweet by steveklabnik:
i have been called out on "lines shorter"
yes, this metric is bullshit. *usually*. in this specific context, many people say that rust's safety capabilities must come with a lot of extra syntax and complexity. this is one tiny counterexample to that narrative.
A GPIO driver for Linux, in Rust.
two calls to unsafe.
75 lines *shorter*
https://lwn.net/Articles/863459/
h/t @laarmen
@steveklabnik replied to a tweet by steveklabnik:
i am learning a few things from these replies (which are great, thank you!)
* many systems don't work like cargo
* many places don't have support for as many things as githubi have been in several monocultures for a long time :)
👀
In reply to:
Announcing tokio-uring: io-uring support for Tokio https://tokio.rs/blog/2021-07-tokio-uring #rustlang
@bascule ("Tony “Abolish ICE” Arcieri 🦀") retweeted:
@bunniestudios ("bunnie") wrote:
I wanted to understand Curve25519 cryptography better (and speed up #Precursor), so I built a hardware accelerator. Having no formal background in number theory, I struggled with the math. I took notes along the way; maybe these are useful to others, too:
@steveklabnik replied to a tweet by steveklabnik:
(sorry folks what i mean is "ssh" here because cargo supports "git" deps in the ssh://git@ form, not the bare git@ form)
@zkat__ ("kat marchán") retweeted:
@vavafle_cmsn ("Jackdu/Commissions closed") wrote:
FF14/Character sheet type B
Commissioned by @KlMEWAZA
@attackerman ("Spencer Ackerman") wrote:
Who wouldn’t want to re-experience the magic of an endless war?
In reply to:
@JustinTLogan ("Justin Logan") wrote:
I'm very happy to invite you to our virtual book forum with @attackerman on Friday, August 13 at 1:00 pm. @charlie_simpson and @Abigail_R_Hall will offer commentary. Relive and argue about the first 20 years of the war on terror with us! https://www.cato.org/events/reign-terror-how-9/11-era-destabilized-america-produced-trump
i need opinions.
for private git repos as cargo dependencies:
* https
* gitand why. are these equivalent? do you prefer one over the other for some reason?
@__phantomderp ("Björk") wrote:
Alright, need some Opinions™:
- Article on ABi Breaks in C and C++ and what's at stake
- Article on Fixing ABi Breaks in C and how to fix some of them
- Article on ztd.text and how to get maximum speed out of it
- Shitpostpls let me know
@bitandbang ("Tierney Cyren") wrote:
is there a way to install fonts from the command line
@lindseybieda ("SIGWITCH⛧") wrote:
All Cakes Are Beautiful
In reply to:
@JaclynLeeTV ("Jaclyn Lee") wrote:
A Philadelphia woman was stunned when she received this cake from The Bakery House in Bryn Mawr. She got the cake for her friend’s 25th anniversary @PhillyPolice. Bakery shop says they are mortified and it was an honest mistake and have nothing but respect for our officers @6abc
waited 9 months to drop this “industry baby” get it lmaoo
In reply to:
i ain’t fall off i just ain’t release my new shttt 😤😤
@attackerman ("Spencer Ackerman") wrote:
Do I have a book for you.
In reply to:
@mattduss ("Matt Duss") wrote:
I'm beginning to think that turning "anti-terrorism" into a multi-trillion dollar industry might have some negative consequences for democracy.
@teller ("Siim Teller") retweeted:
@TheCoolestCool ("Ross Simmonds") wrote:
Copy Experiment:
Don’t write a “call to action”
Write a “call to value” — Here’s what I mean…
[Get started] -> [Plan your finances]
[Sign up] -> [Grow your following]
[Try Now] -> [Launch your site]See the difference ?
Test it and see what works best for you.
@Oatmeal ("The Oatmeal") replied to a tweet by Oatmeal:
I just checked the urinal. I’m happy to report that my mural is still intact
@schneierblog ("Schneier Blog") wrote:
Candiru: Another Cyberweapons Arms Manufacturer https://www.schneier.com/blog/archives/2021/07/candiru-another-cyberweapons-arms-manufacturer.html
@LilNasX ("nope 👶🏾") replied to a tweet by LilNasX:
OUT FRIDAY!
http://FREELILNASX.COM
@LilNasX ("nope 👶🏾") retweeted:
" i don't fuck bitches im queer" changed my life
In reply to:
i ain’t fall off i just ain’t release my new shttt 😤😤