@KUTnathan ("Nathan Bernier") wrote:
ATP says the light-rail options at street level were not developed based on the possibility of a future tunnel.
Many had wondered if a path down 3rd Street (first image) was intended to leave 4th open for a tunnel, as imagined in earlier Project Connect plans (other pics).



