Twitter Feed: Post

Twitter Feed

@steveklabnik retweeted:

@jamesrambin ("James Rambin") wrote:

can’t wait to combine the wildly popular lane reductions necessary for surface rail with a route that’s at best 1/3 as useful as the original proposal and then spend the next fifteen or twenty years getting mad at people who don’t use it

with quote tweet:

@KUTnathan ("Nathan Bernier") wrote:

BREAKING: Five new light-rail options are being unveiled to Austin right now. The plans are significantly scaled back from the 28-mile map shown to voters before the November 2020 election. https://www.kut.org/transportation/2023-03-21/austins-light-rail-plans-have-shrunk-here-are-five-new-options